Case Study: Mandere Construction streamlines subcontractor workflows with Procore

A Procore Case Study

Preview of the Mandere Construction Case Study

Mandere Construction cuts drawing delivery from 2 hours to 30 seconds with Procore

Mandere Construction, a specialty framing contractor, faced significant administrative challenges managing numerous active projects. The manual process of downloading, uploading, and distributing construction drawings from general contractors was time-consuming, taking up to two hours per set, and left field crews at risk of using outdated plans. To overcome this friction and eliminate duplicate data entry, they turned to Procore and implemented its Procore Connect solution.

By using Procore Connect to link their account with their general contractor's, Procore enabled real-time, automated data exchange. This eliminated manual handoffs, providing field crews with instant access to current drawings and submittals. The solution streamlined workflows, minimized rework risk, and enhanced accountability. The efficiency gains contributed to a substantial 200% increase in Mandere's contract work with its primary partner.


View this case study…

Procore

364 Case Studies