Case Study: KD Construction boosts productivity and reduces errors with Procore Connect

A Procore Case Study

Preview of the KD Construction Case Study

KD Construction boosts PM productivity 10-20% with Procore Connect

KD Construction, a national shell contractor, faced significant inefficiencies and risks. Their teams constantly switched between their own Procore instance and those of their general contractor partners, leading to duplicate data entry, disconnected workflows, and a lack of control over their own project documentation. This manual process wasted time and increased the potential for costly errors in the field.

By implementing Procore Connect, Procore's solution for linking separate project instances, KD Construction streamlined its workflows. The platform allowed them to directly connect RFIs and submittals between systems, maintaining ownership of their records. Procore delivered substantial results: a 10-20% productivity improvement for project managers and engineers, improved data integrity, stronger partner collaboration, and better documentation for dispute resolution.


View this case study…

Procore

364 Case Studies