Case Study: Advanced Cable Solutions triples construction volume with Procore

A Procore Case Study

Preview of the Advanced Cable Solutions, Inc Case Study

Advanced Cable Solutions triples construction volume with Procore

Advanced Cable Solutions, Inc. (ACS), a low-voltage specialty contractor, faced challenges scaling its business due to paper-heavy processes and fragmented software tools. This led to time-consuming manual timekeeping, inefficient field documentation, and limited project visibility. To support its expansion, ACS needed a new system and turned to the Procore construction management platform.

By implementing Procore in a disciplined, phased approach, ACS standardized its workflows. Starting with Time Cards and Daily Logs, they expanded into other tools like Drawings and RFIs, enforcing mandatory adoption. This created a single source of truth and integrated with their Sage 100C ERP system. The results for ACS were significant: Procore helped triple construction volume over six years, reduced daily log completion time by up to 75%, and saved days of payroll processing each month.


View this case study…

Procore

364 Case Studies