Case Study: Winkler und Dünnebier Süßwarenmaschinen GmbH achieves greater efficiency and project transparency with proALPHA ERP

A proALPHA Case Study

Preview of the Winkler Und Dünnebier Süßwarenmaschinen GmbH Case Study

Winkler Und Dünnebier Süßwarenmaschinen GmbH cuts change and complaint effort with proALPHA for 304 employees

Winkler und Dünnebier Süßwarenmaschinen GmbH (WDS), a manufacturer of specialized confectionery production machines, faced challenges in managing complex changes to its custom-built systems. The effort for service calls and change processes was high and lacked transparency across departments. To address this, WDS turned to the vendor proALPHA for its ERP solution, seeking to integrate their data and streamline these critical operations.

The solution from proALPHA introduced a consistent change process and fully integrated service management, including spare parts and automated invoicing. This implementation significantly reduced the effort required for changes and complaints in all departments. The success is measurable through improved project transparency and more efficient workflows, allowing proALPHA to provide WDS with the centralized control needed for effective project and quality management.


View this case study…

proALPHA

52 Case Studies