A proALPHA Case Study
Wesemann GmbH, a supplier of laboratory equipment, faced challenges in its project-based production due to long lead times, large safety stocks, and a lack of detailed planning. This led to overcrowded storage areas and limited flexibility. To manage this complex production more efficiently, the company turned to the integrated ERP solution from vendor proALPHA, specifically utilizing its APS (Advanced Planning and Scheduling) module.
The solution implemented by proALPHA provided detailed and realistic planning, allowing production to start at the latest possible time and be coordinated precisely with construction site logistics. This resulted in a 75% reduction in storage space, which was converted into productive area. The measurable impacts for Wesemann include the elimination of safety stocks, more efficient and flexible production planning, and the successful implementation of just-in-time production.