Case Study: Dunlop Systems and Components achieves production efficiency and inventory traceability with Priority Software ERP

A Priority Software Case Study

Preview of the Dunlop Case Study

Dunlop Systems and Components gained full transparency, streamlined BoMs, and easily traceable final products

Dunlop, a Coventry-based manufacturer of advanced electronic control systems and air suspension components, faced an expensive, outmoded legacy management system that produced inaccurate BOMs, routings and poor MRP-driven planning. To replace that system and support production, logistics and project management goals—including future shop-floor data collection and barcoding—Dunlop engaged Priority Software to deploy Priority ERP as a more robust, flexible platform.

Priority Software delivered a standard Priority ERP solution with tailored process and data-flow modifications, ensuring easy-to-use analytics and integrated project management. The implementation produced measurable gains: accurate product costing after timed operations and BOM reviews, executive BI dashboards for live reporting and drill-downs, streamlined BOMs, FIFO & Lot control for full traceability, and tighter procurement and production planning—significantly improving operational efficiency and data trust across the business.


Open case study document...

Priority Software

46 Case Studies