The plastics manufacturer needed to automate its water cooling and recycling system by circulating water through its production area and cooling towers. The challenge was to design and implement the required control panels and pump starters within a strict budget and a very short time frame. Premier Automation provided the solution.
Premier Automation delivered the control panels and pump starters on budget within a three-week turnaround. The solution featured starters that responded automatically to water level, temperature, and pressure, with HMIs for easy operator adjustments. This rapid execution allowed the customer to install the system in-house for further cost savings, and Premier Automation developed a custom pricing matrix to expedite future project quoting.
Plastics manufacturer