Premier Automation
41 Case Studies
A Premier Automation Case Study
Hussey Copper faced significant production challenges due to an unreliable 1990s-era automation system on their F31 Continuous Copper Annealing and Pickling Line. The obsolete system, controlled by Automax PLCs, suffered from frequent communication failures, unpredicted shutdowns, and a lack of available spare parts, leading to costly downtime. To modernize the line and improve operational visibility, they partnered with Premier Automation for a controls upgrade.
Premier Automation executed a comprehensive retrofit, replacing the legacy system with a modern Siemens S7-1500 PLC, new remote I/O panels, and upgraded operator interfaces. The project was completed in just 17 days, minimizing production interruption. The results for Hussey Copper have been exceptional, with zero unplanned downtime related to control failures since the January 2025 commissioning. The solution has provided enhanced real-time visibility for operators and improved production reliability, strengthening the long-term resilience of their operations.