Case Study: Leading Solar Independent Power Producer achieves 2x faster procurement with Precoro

A Precoro Case Study

Preview of the Leading Solar Independent Power Producer Case Study

How a Solar Power Producer Reduced Procurement Cycle Time by 50%

Leading Solar Independent Power Producer, a multi-entity solar IPP operating across Singapore, Indonesia, Malaysia, Vietnam, Thailand, Cambodia, and the Philippines, was struggling with a slow, spreadsheet-based procurement process. Purchase orders were created and approved manually, budget tracking was unreliable, reporting was time-consuming, and human errors often caused POs to exceed project budgets.

The company implemented Precoro to automate purchasing, streamline multi-level approvals, centralize procurement data, and improve budget control, tracking, and reporting across 11 entities. With Precoro, procurement became 2x faster, most POs are now created and approved the same day, and human mistakes in documents were eliminated, while automatic budget updates and 3-way matching improved control and accuracy.


View this case study…

Precoro

22 Case Studies