Powers Business Solutions
80 Case Studies
A Powers Business Solutions Case Study
A Tier 1 automotive metal components supplier was facing a challenge with slow and inconsistent press changeovers, which averaged 89 minutes and were capping throughput. The company engaged Powers Business Solutions to implement a structured SMED system to recover this lost capacity and improve overall equipment effectiveness.
Powers Business Solutions conducted detailed time studies and installed a full SMED system, which included a pre-flight checklist, parameter verification process, and optimized die staging. This solution reduced changeover time by 50% to a 45.5-minute average and increased units per labor hour by 26%. It also eliminated over 300 feet of unnecessary forklift travel per changeover, creating a disciplined and sustainable routine for the plant.
Tier 1 automotive metal components supplier