Case Study: a Tier 1 automotive metal components supplier cuts changeover time 50% with Powers Business Solutions

A Powers Business Solutions Case Study

Preview of the Tier 1 automotive metal components supplier Case Study

Tier 1 Automotive Changeover Reduction | POWERS Case Study

A Tier 1 automotive metal components supplier was facing a challenge with slow and inconsistent press changeovers, which averaged 89 minutes and were capping throughput. The company engaged Powers Business Solutions to implement a structured SMED system to recover this lost capacity and improve overall equipment effectiveness.

Powers Business Solutions conducted detailed time studies and installed a full SMED system, which included a pre-flight checklist, parameter verification process, and optimized die staging. This solution reduced changeover time by 50% to a 45.5-minute average and increased units per labor hour by 26%. It also eliminated over 300 feet of unnecessary forklift travel per changeover, creating a disciplined and sustainable routine for the plant.


View this case study…

Powers Business Solutions

80 Case Studies