Powers Business Solutions
80 Case Studies
A Powers Business Solutions Case Study
The customer, a make-to-order defense manufacturer, faced severe operational challenges including a 56% on-time delivery rate, constant schedule shifts, and excessive rework. The outdated production system lacked reliable data and a unified schedule, causing a culture without accountability. Powers Business Solutions was engaged to address these structural gaps and install a new operating system.
Powers Business Solutions implemented a unified production schedule, a working capacity model, and new leadership routines. They conducted time studies to establish accurate expectations and provided coaching on short-interval scheduling. The solution resulted in a dramatic 59% improvement in on-time performance, reaching 89%, along with a 65% reduction in lead time and a 69% reduction in lost time, all achieved without expansion or new equipment.
A Make-to-order Defense Manufacturer