Powers Business Solutions
80 Case Studies
A Powers Business Solutions Case Study
An industrial safety products manufacturer was struggling with a major order backlog exceeding $1 million and an inability to meet its daily shipping targets. This was caused by three simultaneous disruptions: a new ERP system layered onto non-standardized workflows, a heavy reliance on temporary labor due to a pending plant relocation, and the demand to build three months of inventory. Powers Business Solutions was engaged to install the operating discipline required to manage these challenges.
Powers Business Solutions implemented hourly production discipline, installed real-time performance tracking, and provided leadership coaching across the management chain. They re-engineered key departments and created a detailed inventory-build plan to protect the plant move. As a result, the manufacturer achieved a 23% gain in boxing productivity, consistently met its 1,000-pieces-per-shift target, and increased daily shipping revenue by 17% to an average of $134,000. Powers successfully guided the customer through its relocation without further straining the workforce.
An Industrial Safety Products Manufacturer