Powers Business Solutions
80 Case Studies
A Powers Business Solutions Case Study
A ready-to-drink beverage contract manufacturer was facing a critical quality challenge as its new product line scaled faster than its processes. With quality failing at multiple points from raw materials through co-packing to distribution, the manufacturer engaged Powers Business Solutions for a DMAIC engagement to build the inspection control it lacked.
Powers Business Solutions defined 16 critical inspection points, redesigned packaging, standardized load patterns, and established structured feedback loops between the manufacturer, co-packer, and customer. This solution lifted outbound first-pass quality from 49% to a sustained 70% within four weeks, a 43% improvement, while also significantly reducing damaged goods reaching distribution centers and embedding a scalable quality management system.
A Ready-to-drink Beverage Contract Manufacturer