A global potato processor faced significant operational challenges, including unplanned maintenance, low mechanic utilization of only 35%, and a lengthy 36-hour sanitation turnaround that cut into production runtime. POWERS Business Solutions was engaged to implement a Maintenance Management Operating System to bring structure and planning to their processes.
POWERS orchestrated production, maintenance, and sanitation onto a single critical-path schedule. They installed daily schedule control and mechanic accountability systems, brought contractor and overtime spend under management, and rebuilt parts-kitting processes. As a result, the sanitation turnaround was halved from 36 hours to 18, and skilled-mechanic utilization rose dramatically from 35% to nearly 80%, recovering valuable runtime without adding personnel.
A Global Potato Processor