Stratasys Direct, a service bureau division of Stratasys specializing in 3D printed parts, faced significant bottlenecks and safety risks in its post-printing resin removal process. Their Tucson facility relied on labor-intensive manual methods using isopropyl alcohol (IPA), which led to production delays, inconsistent part quality, and a hazardous work environment. To address these challenges, they partnered with PostProcess Technologies.
PostProcess implemented their DEMI 4100 and DEMI 830 automated resin removal systems along with PLM-403-SUB detergent. This solution drastically reduced the total post-processing time by 60%, cutting a previous 120-minute job down to just 45 minutes. For PostProcess, the results included greatly improved labor efficiency, consistent high-quality cleaning, enhanced safety with a non-flammable detergent, and significant cost savings from reduced IPA usage and waste.
Sean Schoonmaker
Director, Operations