Plutoshift
4 Case Studies
A Plutoshift Case Study
Global Brewer Company worked with Plutoshift to tackle rising operating costs across energy, water, chemicals, and water quality management. The brewery also needed to improve membrane cleaning operations, reduce labor and energy spend, and maintain system performance and compliance while gaining better digital visibility into asset and process performance.
Plutoshift deployed its Plutoshift Advantage platform to predict membrane fouling and scaling, trigger anomaly alerts and correlation analysis, and forecast peak energy use up to seven days in advance. The results included a 17% reduction in operating costs, a 15% reduction in labor costs, and a 12% reduction in energy costs.
Global Brewer Company