Case Study: a high-quality paint manufacturer improves SAP-WMS order processing efficiency with The Planet Group

A The Planet Group Case Study

Preview of the High-quality Paint Manufacturer Case Study

a high-quality paint manufacturer cuts IDOCs from 500/month to 3 with The Planet Group

The customer, a high-quality paint manufacturer, faced operational inefficiencies and high costs due to poor integration between its SAP ECC system and a third-party warehouse management system (WMS). This resulted in a high volume of problematic IDOC messages and unnecessary freight expenses from order changes. The Planet Group was engaged to address these sales-related interface challenges.

The Planet Group analyzed and corrected the communication sequence between the systems. Their solution involved leveraging SAP batch programs, improving user exits, and developing a custom tool to automate sales order creation and data transfer. This new process allowed order changes in SAP to automatically trigger cancellations in the WMS. As a result, The Planet Group helped reduce IDOC volume from 500 to just three per month, eliminated freight and labor costs from erroneous order fulfillment, and improved inventory accuracy.


View this case study…

The Planet Group

14 Case Studies