The Planet Group
14 Case Studies
A The Planet Group Case Study
The customer, a high-quality paint manufacturer, faced operational inefficiencies and high costs due to poor integration between its SAP ECC system and a third-party warehouse management system (WMS). This resulted in a high volume of problematic IDOC messages and unnecessary freight expenses from order changes. The Planet Group was engaged to address these sales-related interface challenges.
The Planet Group analyzed and corrected the communication sequence between the systems. Their solution involved leveraging SAP batch programs, improving user exits, and developing a custom tool to automate sales order creation and data transfer. This new process allowed order changes in SAP to automatically trigger cancellations in the WMS. As a result, The Planet Group helped reduce IDOC volume from 500 to just three per month, eliminated freight and labor costs from erroneous order fulfillment, and improved inventory accuracy.