Planera
22 Case Studies
A Planera Case Study
Silverado, a leading demolition and excavation company on the West Coast, faced challenges with complex pre-construction scheduling. Their team struggled with the steep learning curve of Primavera P6 and inconsistent use of tools like Excel, which created barriers to speed and universal adoption for generating reliable Critical Path Method schedules for every proposal.
By implementing Planera, Silverado embedded a simple and visual scheduling platform into its mandatory pre-construction workflow. The solution enabled any team member to quickly create and sequence schedules, leading to greater efficiency, team alignment, and improved communication. Planera allowed Silverado to standardize its process and even use the tool for ongoing project tracking on jobs without a P6 requirement.