Case Study: Miles-McClellan Construction improves field scheduling with Planera

A Planera Case Study

Preview of the Miles-McClellan Construction Case Study

Miles-McClellan Improves Field Scheduling with Planera on iPad

Miles-McClellan Construction, a general contractor, faced challenges with complex project scheduling as their field teams found traditional tools like Primavera P6 difficult to use on-site. This led to limited engagement, manual workarounds like sticky notes and Excel, and resistance to adoption among staff. The company needed a more accessible solution to bring real-time scheduling to the jobsite.

The vendor, Planera, provided its solution with a specific emphasis on its iPad application. This allowed assistant superintendents to update and manage schedules in real time directly from the field, replacing inefficient manual processes. As a result, Miles-McClellan improved scheduling adoption, simplified workflows, and achieved greater transparency and collaboration between the office and field teams.


View this case study…

Miles-McClellan Construction

John Karam

Assistant Superintendent


Planera

12 Case Studies