A Planera Case Study
Miles-McClellan Construction, a general contractor, faced challenges with complex project scheduling as their field teams found traditional tools like Primavera P6 difficult to use on-site. This led to limited engagement, manual workarounds like sticky notes and Excel, and resistance to adoption among staff. The company needed a more accessible solution to bring real-time scheduling to the jobsite.
The vendor, Planera, provided its solution with a specific emphasis on its iPad application. This allowed assistant superintendents to update and manage schedules in real time directly from the field, replacing inefficient manual processes. As a result, Miles-McClellan improved scheduling adoption, simplified workflows, and achieved greater transparency and collaboration between the office and field teams.