Case Study: California Engineering Contractors streamlines infrastructure rehabilitation scheduling with Planera

A Planera Case Study

Preview of the California Engineering Contractors Case Study

California Engineering Contractors streamlines bridge scheduling with Planera and 3-week look-aheads

California Engineering Contractors (CEC) faced the challenge of managing a complex, multi-phase infrastructure rehabilitation project for the Mare Island Lift Bridge, which required rigorous Critical Path Method (CPM) scheduling to meet Caltrans specifications. Their legacy scheduling software, Primavera P6, had a steep learning curve that isolated the scheduling process from the broader project team, treating it as a specialized "dark art" inaccessible to non-experts.

Planera provided a modern, intuitive visual platform that replaced their legacy system. The solution featured a drag-and-drop canvas that democratized schedule building for project managers and field crews, and it automated the generation of look-ahead schedules. As a result, CEC streamlined its workflows, significantly lowered the learning curve for team members, and transformed scheduling into a collaborative project asset, bridging the gap between field expertise and CPM logic.


View this case study…

Planera

22 Case Studies