A Pivvot Case Study
A large pipeline operator in the oil and gas transmission industry was planning to build a 24-mile pipeline and needed to understand the construction methodology earlier in the project. They had budgeted millions for rock sawing, believing it was required to cut through a significant amount of bedrock. The operator used Pivvot, a platform for project visualization and analysis, to help assess the project design and avoid potential errors.
By using the Pivvot platform to quickly visualize the area and analyze detailed crossing reports, the engineering firm discovered the operator had dramatically overestimated the rock sawing required. This insight from Pivvot revealed that had the platform been used earlier in the planning stages, the operator could have saved millions of dollars that were ultimately committed to the project.
Large Pipeline Operator