Case Study: a large EPC company achieves 50% faster transmission site analysis with Pivvot

A Pivvot Case Study

Preview of the Large EPC Company Case Study

Large EPC Company - Customer Case Study

The large EPC company required a solution to identify viable re-routes for an existing electric transmission corridor located on Federal lands. Their challenge was to quickly find a new path while avoiding specific areas. To address this, they utilized the route module from vendor Pivvot for their analysis.

Using Pivvot's platform, the team input their avoidance areas and analysis criteria, bypassing the need to manually collect data from numerous counties and cities. Pivvot enabled them to generate and compare multiple potential routes to select the optimal one for both cost and environmental impact. This process resulted in a substantial reduction in project timeline, with the client seeing over 50% savings on schedule time.


Open case study document...

Pivvot

10 Case Studies