Case Study: WRBC Development UK achieves CDM compliance on The Scalpel with PIB Risk Management

A PIB Risk Management Case Study

WRBC Development UK delivers The Scalpel across 39 floors with PIB Risk Management

WRBC Development UK faced the challenge of ensuring Construction (Design and Management) Regulations compliance for the construction of The Scalpel, a 39-storey commercial tower in a densely populated area of central London. PIB Risk Management was engaged as the CDM Advisor to manage risks and information flow for the £200 million project, which involved a complex structure with significant safety and future maintenance considerations.

PIB Risk Management provided a collaborative and compliance-focused approach, working closely with the delivery team to develop practical design strategies. These included planning dedicated internal zones away from hazards to preserve privacy and reduce risk, as well as advising on future plant access for maintenance. The vendor successfully supported the safe and compliant delivery of the landmark tower, contributing to its status as one of London’s most distinctive commercial buildings.


View this case study…

PIB Risk Management

14 Case Studies