A PIB Risk Management Case Study
The City of London required expert CDM advice and risk coordination to facilitate essential overnight maintenance closures on the iconic Tower Bridge. The challenge was to keep this critical heritage infrastructure safe, compliant, and operational with minimal disruption to traffic. PIB Risk Management was appointed to provide these CDM Advisor services.
PIB Risk Management delivered the solution by reviewing construction plans, assessing pre-construction information, and supporting coordination between all parties. Their team conducted overnight site monitoring visits during the bridge closures to ensure health and safety compliance. The results were highly successful, with only minor actions raised during inspections, supporting continuous improvement for future work phases and ensuring the bridge's legacy.