Case Study: Swedish Space Corporation achieves reliable aerospace software version control with Perforce P4

A Perforce Case Study

Preview of the Swedish Space Corporation Case Study

Swedish Space Corporation keeps 12-year P4 uptime for mission-critical aerospace software

The Swedish Space Corporation (SSC) required a reliable version control system to manage the development of mission-critical software for its aerospace projects, including rocket and balloon launches. After evaluating available SCM tools, SSC selected Perforce and its P4 version control to help store artifacts, separate builds, and support their monthly release cycles.

Perforce implemented its P4 solution, which provided seamless integration with the team's existing tools like Eclipse, Visual Studio, and Jenkins. The results included stable and predictable software delivery, with the team reporting no server crashes in 12 years. Perforce also enabled easier branching and merging and recently provided distributed version control capabilities to support offline work and distributed teams.


View this case study…

Perforce

223 Case Studies