Perforce
172 Case Studies
A Perforce Case Study
Siemens AG, specifically its Industrial Steam Turbines business unit within Siemens Energy, needed a source code management solution that could handle complex branching, enterprise-wide configuration management, and collaboration across a large, geographically distributed development team. Perforce’s Surround SCM was selected to improve control over software code and support better productivity and efficiency.
Perforce implemented Surround SCM to give Siemens AG stronger code management and smoother collaboration across locations. The result was improved control over development, increased productivity and efficiency, and better support for a cost-conscious investment decision, with Siemens noting it delivered the best ROI for their needs.
Thomas Petzold
Software Development Team Manager