Case Study: St George’s Hall in Liverpool achieves uninterrupted event Wi-Fi with Peplink

A Peplink Case Study

Preview of the a client hosting an annual meeting at St George’s Hall in Liverpool Case Study

St George’s Hall in Liverpool supports 1000 guests with Peplink

St George’s Hall in Liverpool required a reliable internet network for an annual meeting with 1,000 guests. The old building's existing infrastructure was prone to connectivity issues and could not support the high demand, presenting challenges of limited space, power, and a constrained budget. Peplink's partner was tasked with building a resilient network without a single point of failure.

Peplink implemented a solution using an EPX as the core, dual BR2 Pros for cellular backup, and multiple AP One AX access points to ensure full coverage. This setup provided ample high-speed connectivity through a fiber line, with cellular on standby. When a physical cable was accidentally damaged during the event, the redundant design prevented any service interruption, ensuring uninterrupted Wi-Fi for all guests.


View this case study…

Peplink

216 Case Studies