Pensar
115 Case Studies
A Pensar Case Study
Urban Utilities faced an urgent challenge when a condition assessment at their Bundamba Sewerage Treatment Plant found extensive corrosion on the centre column of FST 3, threatening the plant's operating capacity. They engaged Pensar for the urgent replacement of this critical infrastructure component.
Pensar supplied and installed the replacement centre column, managing significant logistical challenges and unforeseen issues like faulty electrical connections. The vendor's extensive preconstruction planning allowed the project to be completed ahead of schedule. Pensar also identified and urgently repaired additional damaged assets, preventing a future plant shutdown, and implemented a cost-saving solution for safe access during the project.