Pensar
115 Case Studies
A Pensar Case Study
Seqwater faced the challenge of upgrading the heritage-listed Mt Crosby Weir Road Bridge, which had significant structural limitations and could no longer support modern vehicle traffic. The vendor, Pensar, was engaged to manage the complex project, which involved working within strict heritage constraints and over environmentally sensitive waterways.
Pensar implemented a solution that included innovative design alternatives and careful mitigation strategies to overcome challenges like a sinkhole and the inability to drill into the existing substrate. The vendor successfully maintained the integrity of the heritage site, formed a positive relationship with Seqwater, and recovered time lost to natural disasters, all while ensuring no environmental pollution occurred.