Case Study: Seqwater achieves a safe, zero-impact water bore replacement with Pensar

A Pensar Case Study

Preview of the Seqwater Case Study

Seqwater completes Point Lookout Water Bore replacement in 4 months with Pensar

Seqwater, a Queensland water supplier, faced a challenge when an existing water bore supplying its Point Lookout Water Treatment Plant was damaged and required replacement. The project involved significant design, drilling, and construction work in an environmentally sensitive area near a wetland on North Stradbroke Island. Seqwater engaged Pensar for its infrastructure expertise to deliver a new water bore solution.

Pensar designed and installed a new water bore with a PVC casing and stainless steel screen, managing all mechanical, civil, and electrical works. The vendor successfully navigated key challenges by liaising closely with the local Aboriginal community to ensure cultural heritage requirements were met and by implementing measures to prevent any environmental impact from the released water. Pensar completed the project with zero safety incidents and zero environmental breaches, delivering a new bore that met all of Seqwater's drinking water quality requirements.


View this case study…

Pensar

115 Case Studies