City of Gold Coast delivers a 5ML/day recycled water plant with Pensar

The City of Gold Coast engaged Pensar for the design and construction of a new 5ML/day Recycled Water Treatment Plant. The project faced significant challenges, including major procurement delays and price increases that impacted the electrical scope, as well as the discovery of PFAS contaminated material on-site just prior to work commencing.

Pensar managed these challenges by maintaining open communication with the client and designing a lined storage area for the contaminated materials. Their in-house design management provided cost and time savings, and their collaborative team procured materials early and proposed value-engineering initiatives. This approach minimized disruptions to daily operations and successfully delivered the new treatment plant and its associated infrastructure.


View this case study…

Pensar

115 Case Studies