MeadWestvaco needed to create additional floor space for processing equipment within a tight five- to six-week window ahead of new warehouse equipment installation. PeakLogix helped by planning and executing the project, including a second-level office system to relocate existing offices and free up the needed space.
PeakLogix designed, delivered, and installed a 26' x 48' two-story modular office with the first level left open for process equipment and the second level configured with two private offices and a multi-person office area. The result was that the offices were completed several weeks before the key process equipment arrived, meeting the customer’s timeline.