Paradigm Technology
39 Case Studies
A Paradigm Technology Case Study
A leading electric and gas utility faced significant challenges with its gas leak data, which was trapped in disconnected silos and required extensive manual effort to remediate. This led to poor visibility into leak causes, regulatory exposure, and delays in reporting. Paradigm Technology was engaged to address these barriers to progress and implement a solution.
Paradigm Technology implemented a foundational data governance and quality framework to centralize and standardize the utility's reporting data. This solution automated validation, enforced data standards, and integrated source systems like SAP. The results included a 40% reduction in manual effort, over $600,000 in first-year savings, and recurring annual savings of $1M+. Paradigm's solution also improved reporting accuracy and significantly reduced regulatory risk.
Leading Electric & Gas Company