Case Study: Miller Electric Company Achieves Faster, Lower-Cost Power Distribution with Panduit FMPS

A Panduit Case Study

Preview of the Miller Electric Company Case Study

Miller Electric Company cuts installation time to 2 days with Panduit

Miller Electric Company, a leading electrical and technology solutions contractor, faced a complex challenge while installing new security cameras and equipment across several large government buildings for a client. The nearest power source was up to 1000 feet away, making traditional power distribution costly and complex due to the need for extensive conduit installation and disruptive power shutdowns. Miller Electric partnered with Panduit to overcome these obstacles.

Panduit implemented its UL-Certified Fault Managed Power System (FMPS), which enabled long-distance power distribution without the need for conduit. This solution from Panduit resulted in significant savings for Miller Electric, including a 22% reduction in total project costs, over 50% in material savings, and a 42% labor cost reduction. The installation time was drastically reduced from two weeks to just two days, and yearly operational costs were estimated to be 78% lower due to fewer UPS units to maintain.


View this case study…

Panduit

20 Case Studies