Case Study: a large industrial contractor reduces deployment time with Panduit BlackFin tools and StructuredGround grounding system

A Panduit Case Study

Preview of the Large Industrial Contractor Case Study

Large Industrial Contractor reduces deployment time on a $14B LNG project with Panduit

A large industrial contractor working on a major $14 billion LNG facility in Texas faced significant challenges. They needed a robust grounding system that could withstand harsh, corrosive conditions and highly reliable installation tools to replace their frequently failing equipment. This was critical to avoid costly downtime and meet the project's aggressive schedule. Panduit provided their StructuredGround™ Direct Burial Compression Grounding System and BlackFin® battery-powered crimping tools to address these challenges.

Panduit's solution eliminated downtime from tool failures and significantly improved installation speed and efficiency. The BlackFin® tools, which are OSHA certified, provided many more crimps per battery charge and withstood the harsh environment. The grounding system met stringent UL and IEEE standards, ensuring long-term reliability and worker safety. This enabled the contractor to maintain their construction schedule, avoid penalties, and ensure the project's equipment would function at peak performance upon deployment.


View this case study…

Panduit

20 Case Studies