DTE Energy’s electric utility serves about 2.1 million customers across roughly 7,600 square miles with some 46,000 miles of power lines. The company faced a persistent operational challenge: when distribution circuits faulted, crews had to patrol long stretches of line to find the problem, prolonging restorations and increasing customer outage minutes.
DTE deployed a network of smart fault indicators and integrated their proprietary sensor heads into the PI System (using PI Server, Asset Framework, Notifications and PI Interface for DNP, with PI-to-PI and cloud connections) and Esri ArcGIS to visualize real-time fault data on mobile maps. Email/SMS alerts and mapped fault locations let crews be dispatched to the right spot—often within five minutes—enabling faster restores; with ~800 sensors now and plans to double that, DTE estimates eliminating at least 500,000 customer outage minutes annually.