Metro de Santiago, the underground rail network serving 2.5 million passengers daily and the second-largest system in the region, needed to deliver two major expansions (Line 3: 22 km, 18 stations; Line 6: 15.5 km, 10 stations) while managing massive volumes of drawings and documents, meeting regulatory compliance, accelerating design reviews to stay on schedule, and maintaining a complete accessible project record for operations and future retrofits.
By adopting Oracle Aconex, the project centralized all project information in the cloud, provided immediate visibility of correspondence and designs, standardized online review workflows, and created a digital archive. Results included a 47% reduction in document review time within six months, a 90% cut in printing/paper costs, a drop in project implementation time from 45 to four hours (91% reduction), and 95% of the cross-organizational team using the platform.