Riyadh Metro Speeds Report Production by 95% with Aconex

Riyadh Metro, a major road and rail project in Saudi Arabia, faced challenges accessing documents across job sites and home offices, managing a complex multi-reviewer design review process, and keeping inspection documents readily available in the field. Oracle Construction and Engineering provided Aconex to help centralize project information and support document and workflow management.

With Oracle Construction and Engineering’s Aconex, Riyadh Metro gained a single, neutral repository for all documents, mobile access for site inspectors, and automated tracking of review changes and versions. The solution enabled more than 2,000 documents to move through design review each week and cut the time for one document controller to produce management reports from two days to as little as 10 minutes a week, while also improving inspection data capture and allowing staff redeployment.


Open case study document...

Oracle Construction and Engineering

99 Case Studies