Case Study: Hensel Phelps reduces handover preparation time by 30% with Oracle Construction and Engineering’s Aconex

A Oracle Construction and Engineering Case Study

Preview of the Hensel Phelps Case Study

Hensel Phelps Reduces Handover Preparation Time by 30% with Aconex

Hensel Phelps, working on the US Federal Office Building project for the U.S. General Services Administration, faced demanding BIM and facility management handover requirements, including processing up to 1,000 documents a day. To meet these needs, the company used Oracle Construction and Engineering’s Aconex Smart Manuals to help organize and prepare O&M documentation for the built asset.

Oracle Construction and Engineering implemented Aconex Smart Manuals as a collaborative digital handover solution to capture, review, assemble, and securely store project documentation and BIM data in the cloud. The results included a 30% reduction in handover preparation time, more than $100,000 in engineering labor savings, 90–100% accuracy improvement, and ongoing cost savings of $50–100 per incident over the asset’s life.


Open case study document...

Hensel Phelps

Derek Hoffine

Project Manager


Oracle Construction and Engineering

99 Case Studies