Oracle Construction and Engineering
99 Case Studies
A Oracle Construction and Engineering Case Study
BAM International used Oracle Construction and Engineering’s Aconex platform to manage the Hazza Bin Zayed Stadium and Mixed-Use Development project in Al Ain, UAE. The team needed a centralized system for multiple organizations, faced resistance to technology adoption, and struggled with long 14-day RFI cycles and difficulty accessing large BIM files away from the office.
Oracle Construction and Engineering implemented Aconex as a secure, neutral collaboration platform with training and standardized use across projects. This helped BAM International cut RFI review cycles by 50%, reduce document controllers from eight to two, and achieve estimated savings of AED 12.9 million (US$3.5 million) through paperless processes, while also giving users fast access to BIM data without authoring software.
Bindu Sunil
Lead Document Controller