Case Study: BAM International cuts RFI review cycles by 50% with Oracle Construction and Engineering

A Oracle Construction and Engineering Case Study

Preview of the BAM International Case Study

BAM International Speeds RFI Cycles by 50% on Hazza Bin Zayed Stadium and Mixed Use Development

BAM International used Oracle Construction and Engineering’s Aconex platform to manage the Hazza Bin Zayed Stadium and Mixed-Use Development project in Al Ain, UAE. The team needed a centralized system for multiple organizations, faced resistance to technology adoption, and struggled with long 14-day RFI cycles and difficulty accessing large BIM files away from the office.

Oracle Construction and Engineering implemented Aconex as a secure, neutral collaboration platform with training and standardized use across projects. This helped BAM International cut RFI review cycles by 50%, reduce document controllers from eight to two, and achieve estimated savings of AED 12.9 million (US$3.5 million) through paperless processes, while also giving users fast access to BIM data without authoring software.


Open case study document...

BAM International

Bindu Sunil

Lead Document Controller


Oracle Construction and Engineering

99 Case Studies