Odebrecht fast-tracks Panama Metro project with Aconex

Odebrecht, in a design-build joint venture with FCC, used Aconex to fast-track the US$1.8 billion Panama Metro Line 2 — adding 21 km of elevated track, 16 stations and a depot to Panama City’s transit system. The project faced an aggressive 44‑month delivery schedule, a rigorous procurement process requiring RFI tracking, hundreds of participants across many organizations, and inefficient manual document control that slowed revisions and distribution.

Using Aconex for project-wide collaboration, structured communications, RFI and transmittal controls, and Connected BIM, the team established a complete audit trail and centralized document management. The result was secure, single-point access to project information, immediate sharing of drawings and correspondence, one-click transmittal of revisions to the right teams, and improved transparency and accountability that helped keep the project on track.


Open case study document...

Odebrecht

Mauricio Mejía Restrepo

Civil Works Engineering Manager


Oracle Aconex

302 Case Studies