Case Study: Louis Berger-Egis Rail JV achieves 60% reduction in document control time with Oracle Aconex

A Oracle Aconex Case Study

Preview of the Louis Berger-Egis Case Study

Louis Berger-Egis Rail JV reduces document control time by 60% using Aconex

Louis Berger‑Egis Rail JV, working on the Doha Metro project in Qatar, faced significant document control challenges: multiple versions to manage, slow manual communications across organizations, inefficient reporting, and the need for a complete, accessible project record.

By implementing Aconex to automate document control, remove hard-copy reviews, enable ad hoc reporting, and archive files in a single neutral database, the team cut document controllers from 15 to 6, saved an estimated US$314,600 in labor and US$26,400 in printing/handling, and reduced report preparation from a full week to minutes.