Case Study: Horizon Nuclear Power achieves 25% improvement in operational efficiency with Oracle Aconex

A Oracle Aconex Case Study

Preview of the Horizon Nuclear Power Case Study

Horizon Nuclear Power has achieved a 25% improvement in operational efficiency across the project

Horizon Nuclear Power, a UK energy company developing the Wylfa Newydd nuclear project on Anglesey, faced stringent regulatory obligations (Nuclear Site Licence and Office for Nuclear Regulation) and the challenge of proving complete control over site activities and design. The programme needed 100% accurate tracking of more than 1 million documents across multiple suppliers and up to ~9,000 onsite workers, and aimed to create a digital twin that could serve as an IT blueprint for future nuclear projects.

Horizon implemented Oracle’s Aconex cloud-based document and communication platform as a single, secure, configurable system with metadata-driven storage and search, meeting regulatory document-control requirements without size constraints. The solution delivered a digital twin compliant with civil nuclear standards and drove measurable benefits: 25% improvement in operational efficiency, 25% reduction in document control costs, a 10% cut in overall IT costs, and an annual savings of 4,000–8,000 man‑hours across 100 team members.


Open case study document...

Horizon Nuclear Power

Roy Irvine

IT Commercial Manager


Oracle Aconex

302 Case Studies