China Major Bridge Engineering Co was up and running on the GuangFo Expressway Foshan section S4 Project in 3 Weeks

China Major Bridge Engineering Co used Aconex on the GuangFo Expressway Foshan Section S4 Project in Foshan, China. The joint-venture project struggled with cross-organization communication, subcontractor collaboration, lengthy review and approval cycles, and inconsistent information management, so they needed a neutral, standardized platform to streamline coordination.

By adopting Aconex templates, configurable workflows and flexible naming conventions, the project was operational in three weeks (75% faster than before) and saw 40% faster RFI/submittal/drawing reviews, 75% faster document handover (20 days vs. three months), 60% faster monthly reporting (one week to two days), and a 66% reduction in required document controllers. The neutral platform improved collaboration and overall project efficiency.


Open case study document...

China Railway Major Bridge Engineering Group Co.

Tao Zeng

General Manager of South China


Oracle Aconex

302 Case Studies