Case Study: ALYSJ JV achieves 50% reduction in rework and errors with Oracle Aconex

A Oracle Aconex Case Study

Preview of the ALYSJ JV Case Study

AECOM speeds submittal turnaround by 50% with Aconex

AKTOR‑YAPI‑L&T‑STFA‑AL JABER ENGINEERING JV, a five‑partner consortium delivering the Gold Line Metro in Qatar, faced the challenge of coordinating a multi‑billion dollar project across 14 construction sites, 10 design teams, 203 subcontractors and more than 2,000 users while managing over 12 million documents and hundreds of review cycles. The JV needed a single, reliable point of reference for real‑time communication with the client and PMC and for collaborative decision‑making across geographically dispersed teams.

They implemented Oracle Aconex as a cloud‑based common data environment with mobile access, configurable workflows, real‑time tracking and reporting, and secure, unrestricted file handling. The platform reduced rework and errors by over 50%, cut review cycles in half (from 28 to 14 days), halved the required document controllers (22 instead of 44), minimized overdue documents and potential penalties, and supported sustainability by reducing printing and copying.


Open case study document...

ALYSJ JV

Suresh Kumar

Document Control Manager


Oracle Aconex

302 Case Studies