Case Study: British Steel improves site-wide utility visibility with Optimal Monitoring

A Optimal Monitoring Case Study

Preview of the British Steel Case Study

British Steel brings 90%+ of electricity use into view with Optimal Monitoring

British Steel required clear utility allocation and visibility at their Skinningrove site, which supports multiple organizations through shared infrastructure. Their challenge was to monitor key electricity, gas, and water points to gain a structured view of consumption. They partnered with vendor Optimal Monitoring to address this need.

Optimal Monitoring installed a multi-utility monitoring system across the site's supplies, creating a stronger foundation for utility visibility. The solution provided detailed gas monitoring and identified remaining gaps in electricity and water coverage. The proposed next phase aims to bring over 90% of electricity use into view to support better energy management and cost allocation.


View this case study…

Optimal Monitoring

11 Case Studies