Opoura
6 Case Studies
A Opoura Case Study
Goldbeck Solar GmbH faced the challenge of integrating a technically complex hybrid renewable project in Austria, which involved 75 MW of new solar PV and 71 MW of existing wind capacity across nine separate parks and three grid connection points. They needed a unified, real-time control system to manage this diverse asset mix and overcome grid access constraints. To solve this, they partnered with Opoura and utilized their OneView Hybrid Control Unit master PPC.
Opoura provided a centralized command platform that acts as a single control point for the entire hybrid setup, enabling seamless management of the varied wind and solar assets. The vendor's proven expertise and full-scope delivery streamlined project execution for Goldbeck Solar. The implementation of this solution, which is scheduled for the second half of 2025, is set to create one of Austria's largest hybrid renewable projects with a total capacity of 146 MW.