OpenBOM
93 Case Studies
A OpenBOM Case Study
The customer, TTM Advanced Manufacturing Group, faced challenges managing a wide range of design inputs and legacy BOM data in various formats, including incomplete and obsolete records. This heterogeneity hindered their ability to efficiently scale their internal manufacturing processes and accurately document what they needed to build or buy. They needed a lean and flexible tool to facilitate a smooth transition from design to their manufacturing floor.
OpenBOM provided a solution with its agile approach and user-friendly platform, which allowed TTM to quickly organize data and move from prototype to manufacturing. The implementation saved TTM over eight hours of engineering time per week, significantly enhancing team effectiveness. The OpenBOM solution also included important security features like Multi-Factor Authentication, aligning with TTM's need to protect intellectual property.
Owen Long
Lead AM Group