Case Study: BC Hydro achieves faster, cost-efficient power generation modeling with Onica and AWS

A Onica Case Study

Preview of the BC Hydro Case Study

Maintaining high security standards while practicing cost efficiency

BC Hydro, a major Canadian electric utility, needed a cloud-based way to accelerate complex power generation output models while keeping security high and costs low. The company partnered with Onica to build an AWS-based cloud infrastructure and serverless computation solution for this on-demand workload.

Onica implemented an automated, secure AWS environment that could spin up 216 CPUs in 10–15 minutes, deploy data and code in five minutes, run the model in 10–12 minutes, and then shut down in 5–10 minutes. The result was a highly cost-efficient process with an estimated run cost of about $10, making BC Hydro’s newest models economically feasible and much faster to execute.


Open case study document...

BC Hydro

Lucas Malesku

IT Architect


Onica

64 Case Studies