Case Study: ADM Milling UK achieves zero unplanned downtime with OAL's control panel upgrade

A OAL Case Study

Preview of the ADM Milling UK Case Study

ADM Milling UK achieves zero unplanned downtime with OAL

ADM Milling UK, a market leader for flour and bakery ingredients, faced the challenge of upgrading a production-critical control panel from the 1980s at their Corby mill. The obsolete panel controlled three flour packing lines and its replacement had to be completed within a strict 14-day shutdown with zero unplanned downtime. OAL was selected for the project based on their industry reputation and proven ability to meet stringent deadlines.

OAL executed the project using their proven methodology, which included extensive survey work, building a new panel with up-to-date components, and completing the installation during the planned shutdown. The result was a seamless upgrade achieved with zero unplanned downtime and no electrical component failures since completion. The new system from OAL provides ADM with reduced downtime, easier maintenance, and future reliability while meeting the latest electrical standards.


View this case study…

OAL

22 Case Studies